Your cart is empty.
Your cart is empty. for 2 Bearing Line Roller System
Disassembling the line roller section, the genuine parts are in the order shown in the photo.(Image #2)
Replace the stock parts with line roller bearings and roller washers, referring to the photo.(Image #3)
When reassembling the line roller, it is easier to work by putting the parts in order on the bail side as shown in the photo.(Image #4)
Finally, squeeze the screws to complete the process.
for 2 Bearing Handle Knob System
Remove the handle knob cap using a genuine DAIWA tool (sold separately).
Replace the black plastic collar inside the handle knob with a handle knob bearing.
The number of washers depends on the reel, so please install them as they were originally.
If the handle knob does not turn, please remove one washer.(Image #5)
One Point Advice
The black plastic color of the handle knob, but it may be hard to remove because it is deep in the knob.(Image #6)
A handle knob cap remover is very useful in these situations.
Parts located in deep places can be easily removed.(Image #7)